TieMap DC

Offline scaffold tie maps for datacenter field crews.

TieMap DC helps scaffold crews lay out tie, guy, and brace geometry for supported frame towers on datacenter jobs.

What It Does

Pricing

Free for up to two saved towers with the full tie map, inspection, and exports. Pro unlocks unlimited saved towers for a one-time $9.99 purchase through Google Play billing. No subscription.

Safety Scope

TieMap DC is a field planning and inspection aid. It does not rate anchors, wind, loads, soil, or structural adequacy. Follow the manufacturer, PE drawing, project spec, competent person, and local authority.

FAQ

Does TieMap DC work without a jobsite signal?

Yes. Tower records, calculations, inspections, and exports are local to the device. Google Play billing is used only for Pro purchase and restore.

What scaffold rule does TieMap DC use?

It supports federal 4 to 1 geometry, California or stricter 3 to 1 geometry, and a custom project ratio. The selected rule is stamped on exports.

Does TieMap DC replace an engineer or competent person?

No. It lays out default spacing geometry only. It does not design tie loads, anchors, wind bracing, soil bearing, or engineered scaffold schedules.

Support

Email [email protected]. Privacy policy.