# TitrateSuite DC TitrateSuite DC is an Android field-aid app by Anvilfield for water-treatment route techs. Canonical landing page: https://anvilfield.com/subapps/titratesuite-dc/ Privacy policy: https://anvilfield.com/subapps/titratesuite-dc/privacy Terms: https://anvilfield.com/subapps/titratesuite-dc/terms Support: support@anvilfield.com What it does: - Turns drop-count titration readings into ppm with kit factor, sample size, and dilution handled. - Estimates loop volume by tonnage, geometry, pipe footage, and tracer test. - Sizes slug dose and continuous feed-pump GPD. - Computes pump stroke and speed settings and verifies output with timed draw-down. - Computes new-loop passivation charge, hold, and step-down. - Saves a local visit log and exports local CSV/PDF files. What it does not do: - It does not read titration color change from the camera. - It does not create accounts or use a backend. - It is not a stamped chemistry record or warranty authority. Pricing: - Free tier with limited titrations and one saved volume. - Pro: $19.99 monthly, $199 annual, or $499 lifetime.