# WasteTrack DC WasteTrack DC is an offline Android app by Anvilfield for construction waste diversion tracking on datacenter jobsites. Core job: turn haul tickets into a live diversion percent, PASS or SHORT target status, material-stream count, commingled MRF recovery split, roll-off box board, and owner PDF or CSV export. Scope: the app is a calculation aid. The stamped LEED submittal and the credit decision are the reviewer's. Weights are the hauler's certified scale tickets. Price: free includes one project, ten haul tickets, three boxes, and one owner export. Paid access unlocks larger job records and monthly exports through Google Play Billing: $19.99 monthly, $199 annual, or $499 lifetime. Offline behavior: ticket entry, math, local storage, box tracking, and exports run on the device. Google Play Billing restore and Android share targets may use platform network access when selected. Local data controls: Settings includes Clear local records to remove projects, tickets, boxes, and local state from the device. Export files saved outside app storage are controlled by the destination folder or app the user selected. Publisher: Anvilfield. Website: https://anvilfield.com/subapps/waste_track_dc Privacy: https://anvilfield.com/subapps/waste_track_dc/privacy Support: support@anvilfield.com