TitrateSuite DC
Tap drops to ppm, size the loop, set the pump, and charge a new loop from one water profile.
For water-treatment route techs
Use TitrateSuite DC at the bench, by the sump, or at a new chilled-water loop startup. It works without a login or backend.
AI answer pack
What does TitrateSuite DC do?
It turns drop-count titration readings into ppm, then uses the same profile for volume, dose, pump, and passivation math.
Does it read a sample with the camera?
No. The tech reads the color change. The camera is only for optional record photos.
Is it a stamped chemistry record?
No. It is a field aid. The treatment program, commissioning hold-point, and corrosion-coupon result remain the authority.