VectorMap ELD Terms
Effective date: June 4, 2026
These terms apply when you use VectorMap ELD, an Android field app by Anvilfield.
Field Use
Use VectorMap ELD as a field aid for roof ELD survey notes, method checks, grid records, photos, and exports. You are responsible for confirming the method, voltage, rig setup, calibration, site conditions, and report content against the rig manual, membrane maker guidance, project spec, and local requirements.
VectorMap ELD does not detect leaks, measure breaches, issue warranties, release a roof for cover, replace a competent ELD technician, or provide engineering, legal, or inspection authority. The ELD rig and the project team remain the source of field decisions.
Pro Purchases
The first three reports are free. Pro access is sold through Google Play billing as a one-time non-subscription purchase for $9.99. Google Play handles payment details and refund requests under Google Play terms and policies. VectorMap ELD uses only the local receipt-backed purchase state needed to unlock Pro features on the device.
Your Records
You control the survey records, photos, witness signatures, settings, and exports you create in the app. Review every export before sending it. Keep your own backups of job records that matter to your work, contract, or client.
No Warranty
To the maximum extent allowed by law, VectorMap ELD is provided without warranties. Anvilfield does not promise that the app will meet every project need, prevent missed defects, satisfy any contract term, or replace professional judgment.
Limitation of Liability
To the maximum extent allowed by law, Anvilfield is not liable for job costs, missed defects, delay, rework, water damage, loss of data, lost profits, or other losses that result from using or being unable to use the app.
Privacy
Read the app-specific VectorMap ELD privacy policy for data handling details.
Contact: [email protected]