Anvilfield field app

WaterShot DC pressure test log

Size thrust blocks, count restrained joints, run the set-down hydro hold timer, and export the signed record for water mains and private fire mains.

Thrust force, block face, and restrained length from keyed pipe, pressure, soil, and fitting data.
C600 and NFPA 24 hydro prep with cure gate, fill and bleed checks, and hold timer.
Before-backfill photos, Double-Bump attempt logs, and PDF/CSV/ZIP export.

Privacy

WaterShot DC stores job data on device. It has no account, no backend, and no analytics. Read the WaterShot DC Privacy Policy.