Cable IR Test Record feature graphic showing a phone reading, meter lead, and cable cross-section

Cable IR Test Record

Log insulation resistance readings by cable, temperature, stage, and verdict. Export a turnover-ready record from the phone.

Offline

No account, backend, cloud sync, ads, analytics, or internet permission.

Field capture

Cable tag, stage, connection, test voltage, photo, temperature, corrected value, and frozen verdict.

Flat Pro

Free for one job. $9.99 one-time Pro unlocks unlimited jobs and clean export through Google Play Billing.

Screenshots

Start the first job screen
Start the job and keep cable tags in one place.
Reading screen with PASS verdict
See corrected value, floor, and verdict in one glance.
Cable detail screen
Add cable details before testing starts.
Field aid safety disclosure
Confirm the field-aid limits before recording data.
Before and after compare screen
Compare baseline and acceptance readings side by side.
Gap finder screen
Find missing acceptance readings, fails, and temp gaps.
Export sheet
Export a turnover package from the job screen.
Settings screen
Set reference temperature, default unit, and safety limits.
Tablet jobs screen
Review the job summary on a wider screen.
Tablet reading screen with PASS verdict
Capture a PASS reading in landscape.
Tablet compare screen
Scan compare rows across the wider viewport.
Tablet export sheet
Choose export format and scope in landscape.
Tablet settings screen
Verify settings and the safety firewall on tablet.

What does it do?

It records IR readings under a cable tag, corrects to the chosen reference temperature, shows the verdict, and exports the record.

Does it work with my meter?

Yes. The app is brand-neutral. Type the number and attach a photo of the display when needed.

Does it approve energization?

No. It is a record and calculation aid. The qualified person and project spec control the final call.