Offline Android tool for low-slope roofing

Design your roof crickets and tapered layout, offline.

Drop drains, draw the bay, and CricketWright sizes the cricket, checks the valley slope, sequences the board stack, and counts the takeoff before the membrane crew starts.

Play listing pendingRead privacy policyRead terms
Works without signalNo account or adsOne-time Pro unlock
CricketWright roof cricket layout and board takeoff preview

One bay, one solved stack

2x

Cricket slope set from the field slope, with manufacturer confirmation when needed.

0.28

Valley slope shown in inches per foot so the diagonal drain path is not guessed.

Q

Cricket rows, field boards, flat fill, waste, and pallet estimate are counted together.

PDF

Export a cut-and-stack layout with the assumptions and disclaimer on the page.

Built for field judgment, not blind approval

CricketWright is a tapered-insulation layout aid based on NRCA/PIMA design practice and IBC minimum-slope rules. It is not a substitute for a manufacturer stamped tapered design, a licensed engineer, or your local code authority. Verify all slopes, board counts, and R-values against the manufacturer data and your AHJ before ordering or installing.

Free for two jobs. Pro is a one-time $8.99 unlock for unlimited projects, board takeoffs, and cut-and-stack PDFs. No subscription, no ads, no analytics.