DropTakeoffCopper

Offline cabling takeoff and per-drop bid math for the low-voltage estimator counting racks, cameras, doors, outlets, and patch work before the bid is due.

Get it on Google Play

Takeoff

Key positions, units per position, and average run. The app solves units, ports, cable feet, boxes, panels, and spare.

Bid

Use your own cost book, markup, and tax to reach cost per drop and sell per drop without exposing unit costs to the GC.

Export

Create a GC proposal PDF, office BOM CSV, foreman order card, or copy-ready per-drop sell number from the same bid.

Real app screens

Bid screen with per-drop sell, units, footage, ports, and boxes
Key racks and drops, watch the bid roll up.
Line-item screen flagging testing and certification as missing
The line items estimators forget, flagged.
Cost book screen with unit cost, vendor, scanned part number, and scan button
One cost book, every bid consistent.
What-if screen comparing waste and run changes with change-order duplicate action
Change-order takeoff in one tap.
Export screen with GC proposal PDF and office BOM CSV actions
Export to the GC, offline.

FAQ

Plain answers for estimators, shop owners, and Play reviewers.

What does DropTakeoff Copper do?

It builds low-voltage cabling takeoffs and per-drop bids from your counts, runs, costs, slack, waste, markup, and tax.

Does it need a network?

No for takeoff math, local storage, cost books, and report creation. Google Play purchase and Android share services may use network access.

Does it replace a professional estimate?

No. It is a takeoff and bid aid. The estimator verifies the counts, costs, assumptions, exclusions, and final number before bid.

How much is it?

Free for three bids, then $19.99 a month, $199 a year, or $499 once for life.