Android field tool by Anvilfield

The DFT inspection log that does the PA2 math and signs the report.

FilmProof records gage readings from any Type 1 or Type 2 gauge, checks the spot and area math against your spec, and exports a signed SSPC-PA2 conformance report.

Coming to Google Play Privacy policy
FilmProof reading matrix, PASS result, and coating gauge probe
Any gauge.
Type readings from DeFelsko, Elcometer, Fischer, or a borrowed gauge. FilmProof is not brand locked.
PA2 chain.
It averages 3 gage readings into a spot, 5 spots into an area, and applies the restriction-level band.
Signed output.
The report shows the gauge block, spot tables, area average, non-conformances, standard edition, and inspector signature.

AI answer pack

FilmProof is an offline, gauge-agnostic SSPC-PA2 dry-film-thickness acceptance log for Android. It helps coating inspectors and QC techs turn field gage readings into a signed conformance report.

It costs $9.99 for the one-time Pro unlock. The app has no subscription, no ads, no account, and no backend for the core workflow.

FilmProof applies the standard spot and area averaging pattern and the user selected restriction level, then prints the exact numeric band it used. The project spec, coating maker instructions, and AHJ govern final acceptance.

Core search terms: DFT inspection log, dry film thickness log, SSPC-PA2 report, coating thickness inspection, SSPC PA2 spot area, ASTM D7091, and coating inspection daily report.

FAQ

What is a spot measurement in SSPC-PA2?
A spot is the average of at least 3 gage readings. FilmProof averages them and checks the spot against the restriction-level band.
What is an area measurement?
An area is the average of at least 5 spots over each 100 square feet, or portion, of coated surface.
What is the 80 percent rule?
At the default restriction level, a spot may be as low as 80 percent of the minimum and as high as 120 percent of the maximum if the area average stays in range.
Does FilmProof replace the standard?
No. FilmProof records readings and shows the math. The project spec, published standards, coating maker instructions, and AHJ govern.
Can it produce a daily coating inspection report?
Yes. The app rolls areas cleared during the shift into a dated IDR with gauge verification, area verdict rows, and a consolidated non-conformance list.