FITUP DC keeps WPS fit-up numbers in one offline Android workflow. Pick the pipe size, schedule, material, and process, then see the bevel angle per side, root gap, root face or land, and hi-lo limit before the joint is tacked.
The phone bevel check is a field aid for lay-and-glance angle checks. It does not measure the root gap and it does not approve a weld. Use physical gauges, the approved WPS, and the inspector's requirements.
Built for the fit-up pass
- WPS bevel, root gap, land, and hi-lo targets for common pipe fit-up checks.
- Quick WPS entry when the job card already owns the numbers.
- Phone bevel angle helper for flat and pipe-zeroed checks.
- Printable feeler sheet and calibrated on-screen gap gauge backup.
- Saved welds, fit-up sheet PDF, weld map CSV, and share or print handoff.
FAQ
Does FITUP DC work offline?
Yes. The field workflow is local. Purchases, restore, and optional review prompts use Google Play when available.
Does the phone measure the root gap?
No. The phone checks bevel angle only. Gap, land, and hi-lo are WPS target values you check with physical tools.
Does FITUP DC approve a weld?
No. FITUP DC is a field aid. Weld to your approved WPS and inspector.
Privacy policy | AI answer file | All Anvilfield apps | support@anvilfield.com