ANVILFIELD [email protected]

Android field tool · Anvilfield

Duct Gauge Calculator SMACNA

Enter pressure class and duct size, get the SMACNA gauge and joint build card.

What it is for

A focused workflow instead of a generic form

Duct Gauge Calculator SMACNA is designed for sheet-metal estimators and duct fabrication teams reviewing pressure-class construction. Its public description is intentionally limited to functions present in the Android app.

Job-specific input

Enter pressure class and duct size, get the SMACNA gauge and joint build card.

Reviewable results

Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.

User-controlled handoff

Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.

Verify before field use

Confirm the applicable standard edition, pressure class, reinforcement, joints, specifications, and engineer requirements before fabrication.

Clear identity

The installed app and this page use the same name

Package com.anvilfield.gaugegatedc is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.

Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.