GroutPour Baseplate DC non-shrink grout calculator and cure clock
GroutPour Baseplate DC computes bag or kit count for machine baseplate grout, including the gap, shoulder, chamfer, headbox, waste, and mixer batches. At the pour, it turns the keyed substrate temperature into a GO, WARM-THE-BASE, or NO-GO verdict and an hours-to-load-bearing estimate.
Field screens
Built for the slab
No login, no backend, no cloud sync. The app saves the job locally and exports a pour log, acceptance card, CSV, and stamped photo through Android share.
Privacy
Jobs, baseplates, pours, product settings, photos, and export files stay on the device unless you choose to share them. Google Play handles purchase and restore. Read the privacy policy, terms, and support page.
Language
v1 is English only. The witness packet, product data sheets, and safety handoff are English-first for this datacenter workflow.
FAQ
Does it measure concrete temperature?
No. Read the substrate temperature from the crew thermometer and key it into the app.
Does it decide bearing capacity?
No. It estimates grout volume and cure timing. The product data sheet, engineer, and witness decide the final acceptance.
Can it work with no signal?
Yes. Math, records, photos, and export files work locally. Sending an export depends on the share destination you pick.
