Hood Suppression Packet

NFPA 17A hood checks with link clock, nozzle map, hydro math, and AHJ PDF.

Run the semi-annual with the hood facts in hand

Hood Suppression Packet helps trained wet-chemical kitchen-hood suppression technicians document the semi-annual, replace metal-alloy links, map every nozzle to the appliance it protects, check cylinder dates, and export the AHJ packet before leaving the site.

The app is a field documentation and calculation aid. It is not an inspection authority, not an AHJ approval, not an acceptance test, and not a substitute for the manufacturer manual, drawings, local code, or licensed technician judgment.

Privacy policy · Support

Workflow

Nozzle map
Walk the appliance line and confirm each nozzle is present, aimed, capped, and tied to the protected appliance.
Link clock
Record metal-alloy link replacement this visit and keep temperature rating notes with the hood record.
Cylinder dates
Check 12-year hydro and six-year maintenance clocks from the collar dates the technician enters.
Exports
Create PDF, CSV, JSON, ZIP, and quick-summary packets from local records and evidence photos.

FAQ

What does it do?
It documents the hood semi-annual, link work, nozzle coverage, cylinder date math, deficiencies, signatures, and reports.
Does it approve an inspection?
No. It records field work and shows checks; the licensed technician and AHJ remain the authority.
Does it need a signal?
No. Core work and report rendering run on the phone without a backend or account.