Built for transformer acceptance work
Electrical lines
IR, PI, DAR, turns ratio, and winding-resistance checks stay on one unit record.
Oil methods
D877 and D1816 entry, water ppm, power factor, IFT, acid, color, and DGA sample logs.
Signed exports
Witness guardrails, release cards, PDF, CSV, evidence photo, and JSON backup exports.
Screenshots
Important scope
Oil Pass Gate is a record aid and calculation aid. It is not a calibrated instrument, engineering approval, legal advice, safety approval, commissioning approval, or a substitute for the project specification, equipment listing, or authority having jurisdiction.