Offline-first Android tool for stone fabricators

How far can your countertop overhang? Get the verdict and bracket plan.

Type the material, thickness, overhang, slab depth, and run length. OverhangProof returns PASS or ENGINEER-IT, lays out bracket spacing, flags point-load and cutout risk, and exports a signed support certificate.

Works without signal after installNo account or adsOne-time Pro unlock
OverhangProof phone preview and countertop support diagram

One counter, one defensible answer

1/3

Checks the slab-depth ceiling so unsupported and supported overhangs stay inside the rule.

200 lb

Flags seated eating bars with a front-edge point load before the slab is fabricated.

20 in

Solves bracket spacing, count, end setback, and support projection from the run length.

PDF

Exports a signed support certificate with the diagram, assumptions, and PE disclaimer.

Built for field judgment, not blind approval

OverhangProof is an overhang and support planning aid based on Natural Stone Institute consensus limits, the 1/3-of-depth rule, and a 200 lb assumed front-edge load. It is not a substitute for the stone manufacturer's installation requirements or a licensed professional engineer. Verify with a PE for structural cases before fabrication.

Free for two jobs. Pro is a one-time $9.99 unlock for unlimited projects, signed Support Certificates, clean diagram PNG export, and custom presets. Purchases and restore use Google Play Billing. No subscription, no ads, no analytics.