ANVILFIELD [email protected]

Android field tool · Anvilfield

Static Pressure Calculator

Enter 4 HVAC manometer readings; find filter, coil, or duct restrictions. PDF.

What it is for

A focused workflow instead of a generic form

Static Pressure Calculator is designed for HVAC technicians interpreting total external static-pressure measurements. Its public description is intentionally limited to functions present in the Android app.

Job-specific input

Enter 4 HVAC manometer readings; find filter, coil, or duct restrictions. PDF.

Reviewable results

Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.

User-controlled handoff

Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.

Verify before field use

Confirm instrument setup, test locations, equipment ratings, filters, airflow, and manufacturer procedures before diagnosing or changing a system.

Clear identity

The installed app and this page use the same name

Package com.anvilfield.staticdoctor is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.

Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.