StaticFloor S20.20

Privacy Policy

Publisher: Anvilfield. Contact: support@anvilfield.com.

StaticFloor S20.20 stores projects, readings, photos, signatures, instruments, and settings on the device. The app has no account, backend, telemetry, analytics, ads, cloud sync, or Android cloud backup for app records.

Anvilfield does not collect, sell, or share the records stored in the app.

Files leave the device only when the user shares a PDF, CSV, failure-map image, field card, or print job through Android system actions.

The app may use the camera when the user scans a calibration sticker or captures a condition photo. The photo or scan result stays in the local record unless the user exports it.

The app strips photo metadata before storing condition photos. Users can clear local records in Settings.

Google Play Billing is used for Pro purchases and restore. Google Play collects payment details directly under its own terms; the app does not access card or billing-address data. StaticFloor stores only a local Pro entitlement record with product, purchase, date, and verification-hash fields so paid features can keep working offline.

After a successful export, the app may ask once for a Google Play review through the Google Play in-app review surface. Anvilfield does not receive app records through that prompt.

The app does not create accounts, so there is no account-deletion process. Clearing local records removes app records from the device.

Terms and limits

StaticFloor is provided as a field aid with no warranty. It does not replace current ANSI/ESD, ASTM, project, or legal requirements. Users are responsible for instrument calibration, readings, standards edition, project spec, and acceptance decisions.

Anvilfield is not liable for acceptance decisions, missed failures, schedule delay, property loss, or other field outcomes.