Type W12X40, get sq ft, gallons by coat, and a priced coating bid PDF.
Android field tool · Anvilfield
Steel Surface Area Calculator
Type W12X40, get sq ft, gallons by coat, and a priced coating bid PDF.
What it is for
A focused workflow instead of a generic form
Steel Surface Area Calculator is designed for coating estimators calculating structural-steel surface area and material quantities. Its public description is intentionally limited to functions present in the Android app.
Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.
Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.
Verify before field use
Confirm member identity, dimensions, exclusions, coating system, solids, loss factors, specifications, and supplier data before bidding.
Clear identity
The installed app and this page use the same name
Package com.anvilfield.steelcoattakeoff is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.
Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.