StripeSet
Lay out parking stalls, auto-place ADA and van-accessible spaces, total paint, and export a dimensioned compliance PDF before leaving the lot.
What it answers
- How many stalls fit in a measured rectangular lot at 90, 60, or 45 degrees?
- How many accessible and van spaces are required for that count?
- How many gallons, pails, cans, and stencils should the crew bring?
Field answers
Can StripeSet calculate accessible parking spaces for a measured lot?
Yes. StripeSet uses the 2010 ADA parking count table, the one-in-six van rule, aisle dimensions, and slope checks to show required accessible and van spaces.
Does StripeSet work without signal?
Yes. Projects stay on the device and the layout, ADA, paint, and PDF workflow runs offline. Google Play Billing is only needed for purchase and restore.
What does the Pro PDF include?
The Pro PDF includes the lot diagram, stall count, accessible and van count, aisle and slope checks, paint takeoff, citations, contractor context, date, and field-estimate disclaimer.
Privacy | Support | Terms | AI answer notes