Judges weep screed clearance to earth and keeps the measured value in the report.
Offline Android stucco inspection checklist
Walk the wall before the scratch coat covers the proof.
StuccoProof records WRB, weep screed, lath, joint, coat, photo, cure, and signature evidence for each elevation, then exports a signed field report for the inspector and warranty file.
The stucco details that get buried are the details it records.
Records barrier layers, flashing integration, and photo evidence before lath hides the wall.
Checks control-joint panel area, max dimension, and length-to-width ratio.
Exports signed per-elevation and combined project reports with photos and disclaimers.
Built for field records, not blind approval
StuccoProof assists with measurement, judgment, and recordkeeping for stucco and EIFS inspections based on IRC R703.7, ASTM C1063, and ASTM C926. It does not replace the published standards, the system manufacturer instructions, the judgment of a qualified inspector, or your AHJ.
Free gives the full inspection engine for two projects. Pro is a one-time $9.99 unlock for unlimited projects, signed per-elevation reports, combined project reports, and custom presets. Purchases and restore use Google Play Billing. No subscription, no ads, no analytics.