Built For The Fire Alarm Test Route
Alarm Sweep 72 is a phone-first field record aid for fire alarm test techs who need a device sweep, sensitivity log, trouble glossary, and export record in one local app.
- Barcode or manual device sweep.
- Smoke detector sensitivity due dates with editable NFPA 72 defaults.
- Common panel trouble decode and deficiency wording.
- Panel on-test, monitoring notify, and restore log.
- PDF, CSV, JSON, and photo ZIP export.
App Screens
Price
Free mode covers a small job up to 25 devices. Pro is a $9.99 one-time unlock on Google Play for unlimited mapped devices and full report exports. There is no subscription.
Field Workflow
Read the fire alarm device test and smoke sensitivity log workflow for the record steps this app is built around.
FAQ
How do I track smoke detector sensitivity due dates?
Enter the detector install date and prior sensitivity records. Alarm Sweep 72 computes the one-year, two-year, then up-to-five-year cadence as editable NFPA 72 defaults.
Can a fire alarm tech use Alarm Sweep 72 without signal?
Yes. Records, device rules, trouble glossary, photos, and exports are local to the phone.
Does Alarm Sweep 72 measure detector sensitivity?
No. It stores the reading from a listed meter, listed panel method, or AHJ-accepted calibrated method.
Is Alarm Sweep 72 an AHJ approval?
No. It is a field record aid for qualified fire alarm technicians. The tech, adopted code edition, OEM manual, and AHJ direction still control the work.