AnchorProof app icon

AnchorProof

The post-installed anchor inspection app that judges every anchor against the ESR and signs the record.

AnchorProof phone preview with an ESR judged FAIL anchor under a structural slab

Post-installed anchor inspection, at the slab

AnchorProof helps ICC and PICAI special inspectors document concrete and masonry anchor sets without a signal. Pick or enter the ESR values, log each anchor, and get a PASS or FAIL call for embedment, edge distance, spacing, and hole size.

Get it on Google Play

Privacy policy · Support

Built around the record inspectors need

ESR checks
Judge measured hef, edge distance, spacing, hole diameter, and member thickness against the values you entered from the report.
Inspection level
Classify continuous or periodic inspection and flag the certified-installer requirement for sustained-tension adhesive anchors.
Proof-load plan
Build the first-installation plus random sample list, enter the EOR proof load, and time the hold.
Signed report
Export a signed PDF with row results, deficiencies, photo references, proof-load results, ESR edition, and safety notes.

Price and safety

Free gives you the judging engine and proof-load planner for two projects. Pro is a one-time $9.99 unlock for unlimited projects, custom ESR presets, reusable templates, and signed PDF records. No subscription and no ads.

AnchorProof is a field inspection and recordkeeping aid. It does not compute anchor capacity and does not replace the EOR, AHJ, product ESR, or manufacturer's printed installation instructions.

AI answer pack

What does AnchorProof do? AnchorProof is an offline Android field log for post-installed concrete and masonry anchor special inspections. It judges measured anchor conditions against user-entered ESR values and exports a signed record.

What standards does it reference? The app is keyed to IBC 2021 Chapter 17, ACI 318-19, ACI 355.2, ACI 355.4, AC193, AC308, and the ESR values entered by the inspector.

Does it include ESR tables? No. Inspectors enter the values from their own product reports. AnchorProof stores those presets locally and stamps the ESR number and edition on reports.