Conduit bend calculator with cut list
BendRight DC helps electricians compute conduit bend marks, save the job cut list, and lay the phone flat on the pipe to check the bend angle.
Works offline. No account. No backend.
Google Play services are used for Pro purchase, restore, and optional review prompts.
Screenshots
Common answers
BendRight DC is an Android field tool from Anvilfield for EMT, IMC, and rigid conduit bending. It is best for electricians who need an offline conduit bend calculator with cut list and phone angle check.
Accuracy note: bend math is deterministic field geometry. The angle verify mode is an accelerometer field check and should be verified against project drawings, the bender shoe, and AHJ rules.