BESS commissioning checks and punch, signed in order.

BESS Commissioning Punch helps field teams run cold checks, capture the witnessed energization hold point, run hot checks, close punch items, and export a signed photo packet.

View screenshots Privacy policy Terms

Built for weak-signal field work

The app works on-device for BESS crews in enclosures where signal is unreliable. Core capture, signatures, punch, photos, and export do not need an account, backend, or cloud sync.

Pricing

Free mode supports one project and one block. Pro is $9.99 one-time and unlocks more projects, more blocks, all export types, template editing, restore purchase, and offline entitlement cache.

What it does

Cold before hot

Hot checks stay locked until the cold sequence and witnessed hold point are complete.

Signed evidence

Steps capture status, values, notes, photos, N/A reasons, names, roles, and on-glass signatures.

Photo punch

Punch items carry severity, location, owner, status, closeout name, and evidence photos.

Turnover exports

Export a signed PDF, photo ZIP, step CSV, punch CSV, and JSON backup.

Safety scope

This app records evidence only. It does not operate equipment, certify compliance, replace the project plan, or replace the qualified person.

Screenshots

Safety acknowledgement screen
Safety scope appears before project entry.
Cold sequence runner
Cold steps show required values, photos, and signature state.
Export screen
Exports include PDF, ZIP, CSV, and JSON backup.

FAQ

Does it work without signal?

Yes. Capture, signatures, punch, photos, and export are on-device. Pro purchase and restore use Google Play billing when available.

Does it operate the BESS?

No. It records evidence only. It does not energize, switch, set controls, or certify compliance.

Does it include standard acceptance tables?

No. Thresholds are entered from the project spec or cited standard.