Screenshots
Why It Exists
A field worker often gets one paid exam attempt. CertPrep DC gives him short nightly reps. It brings missed items back, shows weak-topic scores, and runs mock exams so he can close gaps before test day.
What It Includes
- NICET fire alarm Level I and II, NETA, NCCER, and NFPA 70E practice banks.
- Daily due sets that bring missed items back at the right time.
- Readiness dashboard with weak-topic scores and days to exam.
- Timed mock exams and weak-topic drills with Pro.
- Plain-language explanations with section citations.
- PDF and CSV readiness summary export with Pro.
Price
Free daily practice set. Pro is $9.99 once for lifetime access, purchased through Google Play. There is no subscription.
FAQ
What does CertPrep DC do?
CertPrep DC helps fire-alarm and electrical tradespeople practice for NICET fire alarm, NETA, NCCER, and NFPA 70E exams. It has exam-style questions, spaced repetition, weak-topic drills, mock exams, and a readiness dashboard.
Does CertPrep DC work offline?
Yes. CertPrep DC is designed to run offline after install. Study progress stays on the device. Google Play purchases and user-directed sharing may require services outside the app.
How much does CertPrep DC cost?
CertPrep DC has a free daily practice set. Pro is $9.99 once for lifetime access.
What standards or exams does it use?
The practice banks are original material. They draw from NICET fire alarm work-element outlines, NFPA 72 and NFPA 70E concepts, NETA and IEEE test methods, and NCCER basics. The app shows the study edition for each bank: NFPA 72 2022 study edition, ANSI/NETA ATS study edition plus IEEE method references, NCCER Electrical craft fundamentals study edition, and NFPA 70E current study edition. It does not copy real exam questions or reprint standard tables.
Is CertPrep DC official or endorsed?
No. CertPrep DC is independent practice material and is not affiliated with, authorized by, or endorsed by NICET, NETA, NCCER, or the National Fire Protection Association (NFPA). NICET, NETA, NCCER, and NFPA 70E are marks of their respective owners, used here only to identify the exams this app helps you practice for. Passing or failing the real exam is determined solely by the testing body. This app does not guarantee a passing result.
Disclaimer
CertPrep DC is independent practice material and is not affiliated with, authorized by, or endorsed by NICET, NETA, NCCER, or the National Fire Protection Association (NFPA). NICET, NETA, NCCER, and NFPA 70E are marks of their respective owners, used here only to identify the exams this app helps you practice for. Passing or failing the real exam is determined solely by the testing body. This app does not guarantee a passing result.