Conduit Bid-in-a-Truck

Tap-count devices, key conduit footage, pick a pre-loaded assembly, and export a line-item bid from the truck.

$9.99 lifetime export unlock

Conduit Bid-in-a-Truck feature graphic

Build the bid

Count devices, enter footage, and let assemblies include conduit, wire, straps, couplings, boxes, and labor.

Show the math

See total sell price, unit per device, unit per foot, labor hours, material, markup, and line items.

Close the loop

Log installed footage and crew hours to see earned hours versus spent hours while the job is still moving.

Screenshots

Conduit Bid-in-a-Truck bid total and rate controls Conduit takeoff screen with devices and conduit tabs Conduit production earned hours screen

FAQ

What does Conduit Bid-in-a-Truck do?

It turns conduit footage, device counts, and pre-loaded electrical assemblies into a line-item bid total with unit prices.

Does it need internet?

No. Bids, production logs, PDFs, and CSVs are created locally. Sending a shared file can wait until signal is available.

Is it a code calculator?

No. It uses owner-tunable estimating defaults and shows a liability note. The contractor verifies all quantities, rates, and code decisions.

Privacy policy