ANVILFIELD [email protected]

Android field tool · Anvilfield

Cut and Fill Calculator

Grid shots in, PDF out: cut/fill yards, shrink/swell balance, truck loads.

What it is for

A focused workflow instead of a generic form

Cut and Fill Calculator is designed for sitework estimators, grading crews, and contractors balancing excavation quantities. Its public description is intentionally limited to functions present in the Android app.

Job-specific input

Grid shots in, PDF out: cut/fill yards, shrink/swell balance, truck loads.

Reviewable results

Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.

User-controlled handoff

Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.

Verify before field use

Confirm survey control, grid inputs, material factors, haul assumptions, and contract measurement rules before bidding or moving material.

Clear identity

The installed app and this page use the same name

Package com.anvilfield.dirtbalancedc is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.

Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.