DoorCert is an Anvilfield app for AAADM-certified inspectors, facility managers, and automatic door service teams. It is Android-first, field-ready, and built for offline work in vestibules and back-of-house routes.

Run the inspection without a calculator
Pick the door type, enter timing, speed, force, sensor, signage, and physical checks, and DoorCert judges each value against the restated ANSI/BHMA limit. The closing kinetic energy math is computed from panel weight and measured speed.
Leave with a signed report
Each door record can produce a signed dated one-page PDF report. The report includes the site, door, inspector name, cert number, standard edition string, measured values, limits, verdict, deficiencies, and signature.
Daily safety route logs
Build a daily route from saved doors, follow the daily check steps, tap pass or fail per door, and export a dated route log for the building owner or risk team.
Real app screenshots

Important note
DoorCert is a measurement, calculation, and recordkeeping aid. It does not replace AAADM certification, the published ANSI/BHMA standards, manufacturer instructions, your AHJ, or the judgment of a qualified inspector.
FAQ
What is an AAADM inspection?
It is an annual safety inspection of an automatic pedestrian door by an AAADM-certified inspector, checking timing, force, speed, sensors, and signage against ANSI/BHMA standards.
What is the kinetic energy limit for a low-energy door?
Under ANSI/BHMA A156.19, a low-energy door's kinetic energy in motion must not exceed 1.25 ft-lbf, or 1.69 N-m.
Does DoorCert work without internet?
Yes. The saved limits, calculations, reports, references, sites, doors, presets, and daily route logs work offline on the device. Buying or restoring Pro uses Google Play Billing.
Privacy policy · LLMs.txt · All Anvilfield apps · [email protected]