Transformer Oil DGA Reader

Grade the whole oil page, name the fault, and export the field record offline.

Transformer Oil DGA Reader result and export screens

Transformer oil test reader for commissioning and service work

Transformer Oil DGA Reader is an Android field aid for oil-filled transformers. Type the lab page or calibrated portable-kit readings once, then review dielectric breakdown, water, percent saturation, IFT, acid, color, Duval triangle, Duval pentagon, C57.104 status, and per-serial drift in one place.

Full oil page
Breakdown, water, temperature, IFT, acid, color, gases, reviewer note, and export all stay on the same serial.
Duval geometry
Triangle 1 names the gas pattern, Triangle 4 and 5 refine the cases they are meant to refine, and the pentagon cross-checks the result.
C57.104 status
Derived condition logic separates gas level, rate, and oil-line grading so a fast rise does not disappear inside a single label.
Field exports
Save per-unit PDF, CSV, field-card PNG, and fleet CSV files locally, then share through Android only when you choose a destination.

Price

Free for three transformers. Paid access unlocks unlimited units, clean exports, and saved presets through Google Play Billing: $19.99 monthly, $199 annual, or $499 lifetime.

Scope note

This app does not measure oil or gas and is not an energize-or-not ruling. The lab or calibrated kit is the instrument, and a qualified reviewer makes the energization call. Verify every value and result before energizing.

FAQ

What does this app do? It grades a transformer oil page, plots gases on Duval charts, names the likely fault zone, shows C57.104 status, computes drift, and exports a per-unit result.

Is it offline? Entry, math, plots, local storage, and exports run on-device with no signal. Play Billing restore and Android share targets may use platform network access when available.

Who publishes it? Published by Anvilfield. Support: [email protected].