Size feeders and breakers for multi-EV chargers. Export the NEC 625 permit PDF.
Android field tool · Anvilfield
EV Charger Load Calc NEC 625
Size feeders and breakers for multi-EV chargers. Export the NEC 625 permit PDF.
What it is for
A focused workflow instead of a generic form
EV Charger Load Calc NEC 625 is designed for electrical contractors and designers planning multi-charger feeder and breaker loads. Its public description is intentionally limited to functions present in the Android app.
Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.
Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.
Verify before field use
Verify selected code edition, demand factors, conductor conditions, equipment ratings, local amendments, and permit requirements with the designer and authority having jurisdiction.
Clear identity
The installed app and this page use the same name
Package com.anvilfield.evfeeder is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.
Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.