ANVILFIELD [email protected]

Android field tool · Anvilfield

Weld Fit Up Report & Root Gap

Log root gap, hi-lo, and bevel per joint. Export a weld fit-up report PDF.

What it is for

A focused workflow instead of a generic form

Weld Fit Up Report & Root Gap is designed for welders, fitters, inspectors, and fabrication teams recording joint fit-up measurements. Its public description is intentionally limited to functions present in the Android app.

Job-specific input

Log root gap, hi-lo, and bevel per joint. Export a weld fit-up report PDF.

Reviewable results

Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.

User-controlled handoff

Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.

Verify before field use

Confirm the applicable WPS, drawing, code, material, joint details, hold points, and acceptance authority before welding.

Clear identity

The installed app and this page use the same name

Package com.anvilfield.fitupdc is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.

Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.