FloorGrid DC raised floor level acceptance app

FloorGrid DC is Anvilfield's offline Android tool for raised-access-floor level, lippage, cut-tile, load-test, and QA packet work.

Lay the pedestal grid to the rack plan, prove panel level and lippage, and build the QA packet that releases the hall to rack-set.

Hall A - Glance Offline
1/64 in / 10 ft margin 0.047 in
PASS

Built for raised floor handoff

Measure and grade

Read level as inches per 10 ft, enter lippage, and grade each panel against the limits from your project spec.

Keep the grid

Save readings to a panel grid keyed to the hall module and rack plan. Mark pass, marginal, fail, cut-tile, and heavy-rack cells.

Build the packet

Preview local PDF and CSV packets with grid maps, logs, cut-tile records, load tests, plenum notes, and signature lines.

Core field work runs offline

No backend

The app has no developer-run server, no account flow, no analytics SDK, and no ad SDK.

Local storage

Hall data, readings, settings, packet paths, and cached Pro status stay in app-private storage on the device.

User-triggered files

Files leave the device only when you tap export, share, or print and choose where to send them.

App screens

Glance screen with level result and save controls
Glance level read
Raised floor panel grid with pass and fail status cells
Panel grid record
Cut-tile register with support-risk rows
Cut-tile register
Load-test entry screen with graded cases
Load test log
Packet preview with export actions and QA lines
QA packet preview

Free to $9.99 Pro unlock

Free

  • Full Glance
  • Active hall grid and checks
  • Cut-tile register and load-test set
  • Watermarked PDF export

Pro unlock

  • Clean packet without the free watermark
  • CSV export and print
  • Cached Pro status for offline use after purchase or restore
  • One-time $9.99 purchase

Google Play

Purchase and restore use Google Play billing only when tapped. A verified Pro license is cached for offline use.

Privacy in plain terms

Anvilfield does not collect FloorGrid DC field records. The app stores work records locally and has no backend. Google Play billing processes purchase history for the Pro entitlement when you tap purchase or restore.

FAQ

Can FloorGrid DC replace a stamped survey?

No. It is a field check and packet tool. Use the project-required survey when the spec calls for it.

Does FloorGrid DC work without signal?

Yes. Field work, storage, math, and export work offline. Purchase and restore use Google Play billing when tapped.

Does FloorGrid DC include CISCA tables?

No. It stores the case structure and user-entered project limits without reprinting copyrighted tables.

How accurate is the phone level reading?

Phone readings are field checks. Use a calibrated project instrument when the spec requires survey-grade acceptance.