GroutPour Baseplate DC non-shrink grout calculator and cure clock

GroutPour Baseplate DC computes bag or kit count for machine baseplate grout, including the gap, shoulder, chamfer, headbox, waste, and mixer batches. At the pour, it turns the keyed substrate temperature into a GO, WARM-THE-BASE, or NO-GO verdict and an hours-to-load-bearing estimate.

Get it on Google Play

Field screens

Bag yield screen with grout quantity and staging
Key the plate, gap, and shoulder, get bags plus waste
Jobs screen with job and baseplate list
Track the job and each baseplate in the hall
Cure screen with GO and NO-GO field verdicts
Giant GO / WARM-THE-BASE / NO-GO before you pour
Pour log screen with load-bearing timing
Hours-to-load-bearing, driven by the substrate temp
Product library screen with grout defaults
Pick grout defaults, then confirm against the data sheet
Pro unlock screen with unlimited baseplate offer
Unlock unlimited baseplates and document exports

Built for the slab

No login, no backend, no cloud sync. The app saves the job locally and exports a pour log, acceptance card, CSV, and stamped photo through Android share.

Privacy

Jobs, baseplates, pours, product settings, photos, and export files stay on the device unless you choose to share them. Google Play handles purchase and restore. Read the privacy policy, terms, and support page.

Language

v1 is English only. The witness packet, product data sheets, and safety handoff are English-first for this datacenter workflow.

FAQ

Does it measure concrete temperature?

No. Read the substrate temperature from the crew thermometer and key it into the app.

Does it decide bearing capacity?

No. It estimates grout volume and cure timing. The product data sheet, engineer, and witness decide the final acceptance.

Can it work with no signal?

Yes. Math, records, photos, and export files work locally. Sending an export depends on the share destination you pick.