Laydown Yard Map app icon

Laydown Yard Map

Grid the laydown, pin material by cell, and hand over a clean map.

Gridded laydown yard map with material pins

Find bulk material faster

Laydown Yard Map helps a yard coordinator turn a jobsite laydown into a clear grid. Create a yard, set the cell size, place each bulk item with a photo, then search by name, category, supplier, or PO.

Grid cells
Name each zone with clear rows and columns so crews can find material.
Photo pins
Attach a stack photo, quantity, PO, supplier, and notes to each item.
Move history
Move material between cells and keep a local record of where it went.
Handover exports
Export a PDF map, CSV list, JPEG snapshot, JSON backup, ZIP handover, or item sheet.

Price

Free for one yard and 75 items. One-time Pro adds more yards and items, ZIP handover, JSON backup, site image import, and item sheets. Pro is a one-time Google Play Billing purchase no more than $9.99.

Safety note

Laydown Yard Map is a field aid. It is not a survey, not an engineering drawing, not a system of record for quantities or money, and not a safety authority.

FAQ

Does it need a backend? No. Yard data stays on the phone unless the user exports or shares a file.

What can it export? PDF map, CSV item list, JPEG snapshot, JSON backup, ZIP handover, and single item sheets.

Is GPS survey grade? No. GPS is approximate and only helps crews find material.