Heat loss and tubing
Use quick BTU per square foot presets or detailed U-value surfaces, then size PEX density from spacing.
LoopWright chains room heat loss, tubing spacing, loop count, balanced loop lengths, GPM, head loss, and circulator match into one offline Android workflow.
It is built for hydronic radiant installers who need the loop answer at the manifold, in the basement, or in the truck with no signal.
Use quick BTU per square foot presets or detailed U-value surfaces, then size PEX density from spacing.
Split total tubing under max loop length, keep loop imbalance under 10 percent, and override OEM max loop limits when manufacturer data calls for it.
Calculate GPM from BTU/h and delta T, use bundled PEX pressure-drop data for head, and match the operating point to bundled pump curves.
Render a manifold diagram, port list, loop lengths, and GPM values for the job handoff.
Export a PDF with project details, disclaimer, zone table, materials list, manifold diagram, and port schedule.
The release app bundles its data and stores jobs on device, with no ads and no account. Every calculation runs with no signal; the network is used only for Google Play purchase verification.
The whole system, one verdict.
Loop too long? It catches it.
GPM, head & your circulator - matched.
Balanced loops, glanceable.
PDF loop schedule, on-device.
LoopWright is built for offline hydronic radiant loop sizing on Android. It connects heat loss, tubing density, loop count, GPM, head loss, pump match, and manifold handoff in one workflow.
No developer data collection is built into the release app. Projects, presets, history, settings, and cached Pro entitlement data stay on the device. Google Play handles Pro purchases.
The core single-zone workflow is free. Pro is a one-time $9.99 Google Play in-app purchase for multi-zone jobs, hydronics, glycol, manifold editing, unlimited presets, and PDF export.
Verify every result against current code, the authority having jurisdiction, manufacturer data, and an engineered design before installation.