Average both-direction OTDR splice loss and pass the turnover the first time.

OTDR Bidirectional Loss Log records A-end and B-end splice readings, averages them per splice, catches gainers, reconciles each fiber to the budget you enter, and exports the per-fiber turnover matrix your OSP engineer needs.

Works offline. No account. No backend.

Get it on Google Play

What it does

Pricing

Free tier keeps one active link so you can record a fiber and see the turnover matrix. Pro is a one-time $9.99 unlock, no subscription, and adds unlimited saved links, built budgets, PDF and JSON export, templates, and re-splice evidence. The purchase is processed through Google Play billing, and the Pro entitlement is cached on the device so paid features keep working without signal.

Field limits

OTDR Bidirectional Loss Log is a field aid. It records your readings, averages them both directions, and reconciles them to the budget you enter. It does not replace your OTDR, it does not accept or reject a fiber run for the owner, and it is not a stamped optical-network design. You and your acceptance authority remain responsible for the final pass or fail and for the test method and limits used.