Document pad-mount transformer receiving with photos, nameplate compare, exception text, and local exports before the freight paper is signed.
Create a delivery, add each serial number, capture required photos, compare the nameplate to the PO, check leaks and indicators, then lock a signed record.
Free to use, with PDF records on the free tier. A one-time $9.99 Pro unlock adds clean CSV, JSON, and ZIP exports and removes the free saved-unit limit. No subscription, no account.
Yes. The receiving flow, rules, storage, and exports work locally on the device.
No. It is a field documentation aid. You are responsible for field judgment, utility procedure, carrier tariff, and any required legal or engineering review.
Yes. It generates PDF, CSV, JSON, JPEG, and ZIP records for user-selected Android share targets.
Google Play and the Google Play logo are trademarks of Google LLC.