PanelRun

Lay out every metal roof plane square, with no slivers.

An Anvilfield app for metal roofing installers and estimators. Android-first, offline in the field, free to plan, one-time Pro unlock for cut-sheet PDFs.

Plan each roof plane before the first chalk line

Enter eave length, panel coverage, slope length, overhang, hem fold, and ridge gap. PanelRun gives panel count, leftover width, split-rake layout, seam positions, cut length, and a bundle-by-length rollup.

Built for the jobsite

Important note

PanelRun is a planning aid. Always verify field measurements, manufacturer panel specs, local AHJ requirements, and code before ordering or installing. Built-in profile values are typical references only. The app does not perform structural or wind-load design.

Privacy policy · All Anvilfield apps · [email protected]