PullRight DC cable pull tension calculator
Offline cable pull tension, sidewall pressure, jam ratio, and set-down alarm number for feeder and backbone pulls.
Capstan tension through each sweep, in pull order.
Sidewall pressure and fiber bend radius flags before the pull starts.
Dry vs lubed, feed-direction flip, and soft-start warning.
Saved runs, duplicate pod pulls, PDF and CSV export.
Built for the pull setup
Pricing
Full pull math on one saved run and one cable preset, up to two 90-degree sweeps. Safety flags and the rated-pull check are never gated.
Unlimited sweeps, runs, and cable presets, feed-direction flip, reverse capacity check, and PDF and CSV export.
$4.99 per month, $39.99 per year, or $99 one-time lifetime. No subscription required.
FAQ
Does PullRight DC measure live rope tension?
No. The dynamometer is the live instrument. PullRight DC gives the planned ceiling before the rope goes taut.
Does it work with no signal?
Yes. The calculator, saved runs, cable library, and PDF or CSV generation work on device.
What should I verify before pulling?
Confirm the cable's rated pull and minimum bend radius against the reel tag, and check your tugger and rope ratings.
Privacy Policy · Terms And Limits · Support
Google Play and the Google Play logo are trademarks of Google LLC.