Reel Receiving

Inspect cable reels at the dock, flag moisture and shortage risk, track the claim clock, and build a clean packet before the delivery receipt is signed clean.

Offline Android app PDF packets ZIP, CSV, JSON exports
Reel Receiving app icon
Reel Receiving dock inspection workflow

Built for cable reel receiving

Fixed reel sweep
Tag, orientation, flanges, hubs, end seals, jacket, footage, and POD evidence.
Damage math
Bend radius, marker mismatch, shortage, moisture risk, and carrier deadline checks.
Local packets
Generate PDF, ZIP, CSV, JSON, and portal fields on the device.

Screenshots

Reel Receiving home screen Reel Receiving header form Reel Receiving reel tag screen Reel Receiving QC screen Reel Receiving packet export screen

Important scope

Reel Receiving is a field documentation aid. It is not engineering acceptance, product certification, legal advice, carrier claim submission, or proof that cable is safe or unsafe.

Privacy Policy | Terms | [email protected]