Slide-Out Sync Setter

RV slide mechanism ID, re-sync steps, amp-band checks, fault notes, camera proof, and export packets for service techs in the bay or at the campsite.

Procedure

Photo-match the mechanism and read the right re-sync, homing, override, or reset path.

Measurement

Record clamp-meter amps and branch the result to binding, no power, cable tension, high, low, or in-band.

Proof

Export service records, warranty packets, customer summaries, CSV, JSON backups, and quick share text.

App Screens

Mechanism picker

Pick the mechanism.

Amp baseline

Check amp bands.

Export packet

Export field proof.

Field aid only. Verify against the current coach builder and slide manufacturer manual. Not OEM service authority, not a warranty approval, and not a calibrated instrument.