SpliceCoach DC

Land a tray that passes the OTDR. Do not get fooled by a gainer.

Type the two direction readings, see the true bidirectional average, and keep the whole tray ledger on the bench with no account and no signal.

GAINER
Direction 1 -0.02 dB
Direction 2 0.10 dB
0.04 dBPASS
Fiber 1 passed
Fiber 2 next

Built for the splice bench

True average

Average A-to-B and B-to-A readings so a negative OTDR gainer does not fool the tray call.

Stateful ledger

Keep every fiber pending, passed, marginal, failed, or ready to re-check.

Cause coach

When loss runs high, see the field actions for contamination, cleave angle, fiber mismatch, and arc calibration.

SpliceCoach DC gainer verdict screen
Gainer math with a clear pass verdict.
SpliceCoach DC tray ledger screen
Tray ledger with the next splice visible.
SpliceCoach DC cause coach screen
Cause coach for high-loss events.

Honest scope

SpliceCoach DC is a field coaching and ledger tool. It does not replace the OTDR, the job sheet, the manufacturer cert, or the lead splicer's sign-off.

Core math and tray storage run offline. Exports use the Android share sheet only when you choose to share a CSV or text report.