Wire sizing calculator

Voltage Drop — FieldOS Wire Walk

Walk the run, accumulate segments, show the table line, and save the checked result to the job instead of retyping it later.

Run the voltage-drop example

Worked example: 32 A, 240 V, 240 ft, copper, 3 percent target.

What gets saved in FieldOS

Inputs

Load, voltage, measured run, conductor, target drop, table date, and what you marked checked are stored with the property.

Calculation output

The card shows ampacity and voltage-drop basis together so a wire that passes one check but misses the other is visible.

Export

The result stores formula, table citation, assumptions, and what you marked checked with the packet/export record.