Features

Job Photos Today, Field Memory That Compounds

The first screen is capture. The deeper system remembers properties, builds packets, runs deterministic math, and exports everything.

Core workflows

Before/after photos

The camera ties each shot to the job, property, time, section, and label at capture.

Proof packets

Checked, customer-readable reports with share and PDF paths.

It does the math

32 built-in calculators — wire sizing, leak rate, pay applications, deposits, crew-hour estimates and more — run locally, offline, with the math shown.