Trust pattern
Inputs visible
Measured fields and accumulator rows sit beside the result.
Math shown
The formula, table line, assumptions, confidence tier, and liability scope are non-removable.
Saved to job
Accepted numbers become calculation records, not loose calculator screenshots.