Refrigerant leak-rate calculator
Refrigerant Leak Rate, Shown Step by Step
Annualizing is the step people skip under pressure. FieldOS records the charge, added amount, dates, math, and check status.
Formula made visible
Annualizing step
The output shows added charge, full charge, and the 365/days factor instead of hiding the result in one number.
Records travel together
The calculated value, scale note, date range, table date, and source visit stay together for export.
Result states
Thin data, missing charge size, or unclear dates block the in-app result until the user types or confirms the missing input.