Lifetime tool

FieldOS Refrigerant Log

Track refrigerant additions, annualize leak rate, preserve the math, and export a checked field record.

What it saves

Charge events

Amount added, system charge, dates, notes, and source visit stay together.

Annualized rate

The calculation card shows the annualizing factor instead of hiding it in a result field.

Export

PDF and CSV records carry the field-aid footer for checking.