Feature

Client Sharing Without a Portal

Send a checked PDF or hosted packet link. The recipient opens it from the link and installs nothing.

Delivery discipline

PDF now

The PDF path works locally even when the hosted link must wait for signal.

Hosted link

Token links can expire, be revoked, and optionally record opens and typed receipt names.

User-mediated send

Email and SMS use the operating-system share sheet. Anvil Field does not auto-send customer messages.