Built for recurring stops
Open the property, tap Start Visit, shoot before and after, then send a clean proof packet. Gate, dog, turf, parking, and last-visit notes appear when the crew needs them.
Job-tied camera
Every photo is stamped to property, visit, time, and Before or After at capture.
No-access record
Locked gate or loose dog gets a timestamped note and optional photo before the route moves on.
Restock and route hints
Materials logs and your own stop history feed the restock check, the loadout readiness score, your usual stop order, and parking and access memory.